cropped-cinpaa-logo-carre-transparent.png

Gas Lift Operation and How to Perform Chemical Treatment of Wells©.

Loading Events

Gas Lift Operation and How to Perform Chemical Treatment of Wells©.

22 Jul - 26 Jul

Gas Lift Operation and How to Perform Chemical Treatment of Wells©.

  Objectives:

 

By the end of the course, participants will be able to:

 

  1. Understand the Basics of Gas Lift Operation:
  • Definition and importance of gas lift.
  • Components of the gas lift system and their functions.
  • Principles of gas lift system operation.
  1. Apply Gas Lift Techniques:
  • Design and selection methods for gas lift systems.
  • Installation and operation procedures for gas lift systems.
  • Continuous improvement of gas lift systems.
  1. Understand Chemical Treatment of Wells:
  • Definition and importance of chemical treatment.
  • Chemicals used in well treatment.
  • Techniques for applying chemical treatment in wells.
  1. Apply Chemical Treatment Techniques:
  • Evaluating wells and selecting appropriate chemical treatments.
  • Procedures for implementing chemical treatment.
  • Monitoring and evaluating the effectiveness of chemical treatment.

.

 

 THIS COURSE FOR

 

 

  • Petroleum and gas engineers.
  • Field technicians and operators.
  • Specialists in well maintenance and management.
  • Project and operations managers in the oil and gas sector..

 

The Course Content Agenda

 

 

Day 1: Introduction to Gas Lift Operation

  • Session 1: Definition of gas lift (2 hours)
  • Session 2: Importance of gas lift in the oil and gas industry (2 hours)

Day 2: Components of the Gas Lift System

  • Session 3: Main components of the gas lift system (2 hours)
  • Session 4: Functions of each component and how they work (2 hours)

Day 3: Principles of Gas Lift System Operation

  • Session 5: Basic principles of gas lift system operation (2 hours)
  • Session 6: Factors affecting system efficiency (2 hours)

Day 4: Design and Selection of Gas Lift Systems

  • Session 7: How to design a gas lift system (2 hours)
  • Session 8: Criteria for selecting the appropriate system (2 hours)

Day 5: Installation and Operation of Gas Lift Systems

  • Session 9: Steps for installing the system (2 hours)
  • Session 10: Procedures for operating and adjusting the system (2 hours)

 

Day 6: Introduction to Chemical Treatment of Wells

  • Session 1: Definition of chemical treatment (2 hours)
  • Session 2: Importance of chemical treatment in the oil and gas industry (2 hours)

Day 7: Chemicals Used in Well Treatment

  • Session 3: Types of chemicals and their uses (2 hours)
  • Session 4: Properties of chemicals and how to select them (2 hours)

Day 8: Techniques for Applying Chemical Treatment

  • Session 5: Methods and techniques of treatment (2 hours)
  • Session 6: Challenges and potential issues (2 hours)

Day 9: Evaluating Wells and Selecting Appropriate Treatments

  • Session 7: Methods for evaluating well conditions (2 hours)
  • Session 8: How to select appropriate chemical treatments (2 hours)

Day 10: Implementing and Evaluating Chemical Treatment

  • Session 9: Steps for implementing chemical treatment (2 hours)
  • Session 10: Monitoring, evaluating, and improving treatment effectiveness (2 hours)

Share This Event

  • This event has passed.

Details

Start:
July 22
End:
July 26
Cost:
7800€
Event Categories:
, ,

Venue

Spain, MADRID
Spain + Google Map


تعقد هذه الدورة في مدن وأوقات مختلفة يمكنكم طلبها في نموذج التسجيل التالي

للتسجيل ومزيد من المعلومات

اضغط هنا

For more information send us at:

info@cinpaa.org
or whatsapp or viber:


+34-63-586-76-86

طلب استفسار